Free standard shipping
Expedited Sewing Time: 7-14 Days + Expedited Shipping Time: 3-7 Business Days.
Standard Sewing Time: 15-20 Days + Standard Shipping Time: 10-15 Business Days.
Built-in bra: Yes
Back Details: Button
Season: Spring,Summer
Neckline: Sweetheart
Material: Tulle
Silhouette: A-line
Body Shape: Misses
Train: Sweep / Brush Train
Sleeve Length: Sleeveless
Waist Line: Natural
Hemline: Floor-length
Embellishment: Lace,Appliques
The estimated production time is within 2 weeks before items are shipped. Rush Production is available for an additional nonrefundable fee.
SHIPPING is an additional 3-10 days depending on Location and Shipping Method. Shipping time option will be provided at checkout. See More
Thanks for subscribing!
This email has been registered!
Product | SKU | Description | Collection | Availability | Product Type | Other Details |
---|